Minotaur Exploration – Drilling underway at Catch Dam and Mingary Copper + Gold targets

Minotaur Exploration | Symposium Client 2014Highlights

  • Inaugural drill hole at Catch Dam targeting exceptionally strong IP chargeability anomaly for Cu+Au mineralisation
  • Drill campaign at Mingary targeting EM conductors for Cu+Au+Pb+Zn mineralisation
  • Drilling expected to take 3 weeks.

Drill testing is underway at various new copper+gold and other base metals targets ~400 km northeast of Adelaide (Figure 1). The four-hole Diamond and Reverse Circulation drill program (for 1,100m, Table 1) incorporates one deep diamond hole at the ‘Bella Vista’ anomaly at Catch Dam on EL 4352 (Collins Tank tenement) and three reverse circulation holes near the old Mingary Mine on EL 4745 (Bonython Hill tenement).

To read the full ASX announcement, click here.

Minotaur Exploration (ASX:MEP) is participating at the Resources Investment Symposium held in Broken Hill, 25-28 May 2014. For more information about the symposium, click here.

RIS2014_WebBanner_728x90_V1